Navigation Menu+

College Crossing Buildings C-H

Posted on Apr 5, 2015 by in Build, Warehouse | 0 comments

Document1

Project Elements:

Lenexa, KS

Contract Amount: $11, 200,000

Total Square Footage: 6 buildings; 300,000 SF

  • Project Overview:

Two buildings completed in 2006 and four buildings in Phase II were negotiated and completed by the end of 2008.

(Buildings C,D,E,F,G & H)

There is a total of 300,000 SF of OfficeWarehouse space. The buildings are
constructed of tilt up concrete wall panels with hybrid steel structure to allow for tall clear heights in each building.

The exterior color schemes will match the earlier phase of construction to help unify the park’s design.

Major Building Features: 

  • Tilt –Up Panels
  • Conventional steel system
  • Storefront glass system
  • Mechanically Fastened TPO
  • ESFR
  • Rear Loading
  • Drive-In Doors
  • Dock Doors
  • Knock Out Panels for future Dock Doors

 

  • College Crossing Park
  • College C-H Exterior
  • College C & H Exterior