Build - Warehouse - Machine LabProject Elements:

Lenexa, KS

Contract Amount: $3,000,000

Total Square Footage: 55,000

Duration: 4.5 months

Project Overview:

This project was built on a Design Build method of construction to accelerate the client’s occupancy date. Even with the demanding schedule Merit was able to meet the dead line while building under fall and winter conditions.

Due to the high standards of this client’s clientele thisOffice/Warehouse Building was built with a Class A finish.


Major Building Features:

  • Traditional block and brick walls
  • EPDM rubber roof
  • 4.5 month start to finish schedule
  • Class A finish
  • Heavy electrical and mechanical to accommodate production

 

  • Machine Lab sign
  • Machine Lab Loading Dock